18th Posting - Top of Back Wall Framed Up

Work on the 'roof' has begun, even in January! The walls are built to over 8 feet high all around, and  on Thursday my sister Valerie and I framed up the back wall another 3 feet with 2x6's and two very sturdy window frames for a couple 2x3 windows. It was a beautiful day in the 40's and we finished just after sunset. The next step will be laying I-Joists from the back wall to the front wall and then the plywood is ready to go on the roof.

The top of the back wall, viewed from behind the cabin, with a sunset in the background.

The 3-foot wall viewed from the south end of the cabin looking uphill.